Coating

Prevent costly site clean ups and potential hazards with Halo’s custom compressor solutions. Gas compressor building look like this? The Problem Gas Compressors have always been a challenge to contain the leaking fluids from the engine due to the constant vibration in the building.  This violent vibration from the engine that drives the compressor causes […]
April 12, 2021
A new oil and gas service. Halo is pleased to announce a NEW joint venture with Trident Environmental Services to bring exposure to their industry leading technology that will revolutionize the coatings removal process in the Canadian oil and gas industry. We are pleased to offer this new service in conjunction with our industry leading coatings solutions to […]
February 24, 2021
Below are case studies demonstrating how gas compressors can affect the integrity of your well sites. Halo offers solutions for such situations . . . CASE STUDY #1 Gas Compressors Contaminate Well Sites The PROBLEM Gas Compressors have always been a challenge to contain the leaking fluids from the engine due to the constant vibration […]
April 21, 2020
Secondary Containment SPRAY FORM INSULATION   SPRAY APPLIED POLYURETHANE LINERS Polyurethane Spray Liner Membrane Advantages: UV and fire resistant – ULC 668 Compliant Does not require ground cover – makes for easier integrity inspections Preserves and protects concrete Can be installed in cold weather of -30oC and lower No boots, clamps, bolts or caulking required […]
January 24, 2020
Despite all the rain we received this summer – Halo has been hard at work servicing our clients throughout Western Canada. Below are two case studies that have made a significant difference in the operational function of effective tank storage and preventing energy loss when heating liquids in the storage tanks. Tank FARMS   The […]
October 25, 2019
Wondering if your concrete trenches or sumps are holding fluid as per the AER regulations? Here’s an example of a common issue many of our clients experience with these floor drains. The NEED Containing fluid in concrete floor trenches and sumps and remaining compliant with AER D-55. The PROBLEM Concrete is porous and is not a barrier […]
November 15, 2018

Have aQuestion?

Contact Form

  • This field is for validation purposes and should be left unchanged.
Close Popup

Questions?Send Us a Message

Contact Form (Popup)

  • This field is for validation purposes and should be left unchanged.